im电竞在线登录

Contact Us

BEATRICE TATE SCHOOL FINISHING TOUCHES

Cotaplan Building Systems are just on the verge of completing new classrooms at Beatrice Tate School in London.  When completed, this modular block will boast the following finishes: THERMOWOOD CLADDING – this is pre-treated to reduce cracks and twists over time....

read more

NEW MODULAR TEACHING FACILITY IN SIDCUP

Cotaplan have recently completed a new modular classroom block in Sidcup.  Working alongside a main contractor, who prepared the site with foundations and services whilst we manufactured the building off site ready for delivery. This modular facility will be used for...

read more

NEW OFFICE & WELFARE FACILITIES FOR FACTORY IN EXETER

In the fast-paced world of work, when accommodation is required quickly, Cotaplan can provide bespoke and ‘oven ready’ solutions to cater for most building needs. Cotaplan installed this building inside a factory in Exeter at the beginning of November - ready for...

read more

Installation for Tower Hamlets Local Authority

Cotaplan have installed a 10-bay modular building in Mile End, London.  When finished, this 32.6m x 12.5m classroom block will be used as a teaching facility for children with a range of learning needs.  Fully fitted out with air conditioning, heat recovery...

read more

NEW TEACHING FACILITY IN SUTTON, LONDON

Cotaplan have recently completed a new double classroom block at a school in Wallington, Sutton.  The facility was designed to be in keeping with an existing modular building on site with: full height white windows, Goosewing Grey plastisol steel finish, air...

read more

NEW MODULAR CLASSROOMS COMPLETED ON TIME

Cotaplan have completed a set of double classroom blocks at a school in Tower Hamlets – just across the river from Greenwich village.  The project was initially hampered by the pandemic lockdown but resumed and completed in June ready for the next academic term. The...

read more

NEW ASSESSMENT PODS FOR THE NHS

Cotaplan have recently installed assessments pods at 2 local hospitals in the Greater Manchester area.  These pods are finished with offices, gowning rooms, toilet facilities, IPS panelling, easy wipeable walls and NHS medical sinks - ready for occupation within a...

read more

NEW WELFARE FACILITIES IN BASINGSTOKE

New Welfare Facilities in Basingstoke   Our team are currently in the final stages of completing a brand new welfare facility for a client in Basingstoke. Once complete, this bespoke modular building will incorporate a canteen, dry room, showers, toilet, office...

read more

ON THE ROAD TO COMPLETION

Watford Cycle Hub is nearing the final stages of the race to completion. The full process will have seen their decant into our temporary cycle hub, demolition of the old facility and then preparation and installation of the new modular cycle hub. This new custom...

read more

OPENING OF NEW CHANGING ROOM FACILITY IN RIPON

Cotaplan recently completed a new modular changing facility in Ripon and yesterday, it was officially opened by a rugby union player and coaching legend. The building is the centerpiece of new sport’s facilities at Ripon Grammar School and yesterday’s ceremony was a...

read more

Cycle Hub on track with New Modular Building

Cotaplan have recently installed a temporary cycle hub building at a site in Watford.  The foundation pads and temporary services were fitted the week before- ready for the 4 modules and temporary steps the following week. This sectional building will be used to...

read more

For more information on Cotaplan Modular building products and services, contact us on (0800) 7999049  or, alternatively you can email a member of the team direct at  info@cotaplan.co.uk .

For an immediate response, contact us today

CONTACT COTAPLAN TODAY

友情链: im电竞APP网址(正规的电竞竞猜软件下载)|IM电竞官网入口app最新版 | im体育app官方入口(电竞竞猜官方app)|im电竞app播单 | im电竞官网下载(体育电竞平台appPG)|im电竞app在那下载 | im电竞在线登录(电竞体育彩票竞猜网站下载)|im电竞官网入口app下载 | im电竞app官方网站(电竞联赛竞猜平台排名软件)|im电竞下载链接 | im电竞哪里下载(竞猜电竞的软件)|im电竞软件下载 | im电竞app首页(竞竞猜平台大全下载)|im电竞下载安装 |