Modular Building in Cippenham

Modular Building

Cippenham, Berkshire

Cotaplan were commissioned to provide a 11m x 5m single storey modular building.

The building was linked to the existing nursery and installed over a weekend, thus allowing the school to operate as normal for the remainder of the project.

i

The building was finished with air-conditioning, fitted kitchen, IPS panelling to the washroom, increased headroom with a suspended ceiling and fully integrated fire and intruder alarm systems.

A combination of Thermowood timber and Plastisol steel cladding was fitted to the exterior.

Tape and jointed plaster was applied to all internal walls with an emulsion painted finish.

}

It took 8 weeks on site to complete the build from start to finish.

Looking for something similar?

If you're looking for a modular building similar to this, speak to one of our team today by calling or emailing your requirements.

友情链: im电竞APP网址(正规的电竞竞猜软件下载)|IM电竞官网入口app最新版 | im体育app官方入口(电竞竞猜官方app)|im电竞app播单 | im电竞官网下载(体育电竞平台appPG)|im电竞app在那下载 | im电竞在线登录(电竞体育彩票竞猜网站下载)|im电竞官网入口app下载 | im电竞app官方网站(电竞联赛竞猜平台排名软件)|im电竞下载链接 | im电竞哪里下载(竞猜电竞的软件)|im电竞软件下载 | im电竞app首页(竞竞猜平台大全下载)|im电竞下载安装 |